by Griffin Ellis | Aug 18, 2026 | Behind the Build
BEFORE AFTER When Relentless Church began preparing an existing church facility for their next chapter, Griffin Technical Designs was brought in to help support several key production elements throughout the space. Our scope focused on three areas: lighting,...
by Griffin Ellis | May 26, 2026 | Behind the Build
Technology should make ministry easier—not create another obstacle for staff and volunteers. Gateway Church needed a simpler way to operate the audio and lighting systems in its Kidz area. With multiple systems and separate controls, managing the room’s technology...
by Griffin Ellis | Mar 17, 2026 | Behind the Build
Gateway Church needed a more reliable and capable audio system to support its weekly services, worship ministry, and special events. After a brownout damaged part of the church’s existing audio equipment, it became clear that simply replacing the failed components...
by Griffin Ellis | Feb 28, 2026 | Behind the Build
Moving a broadcast facility involves far more than packing equipment and reconnecting it at a new address. Every component has to arrive at the right place, at the right time, and in the correct configuration—all while the organization continues preparing to produce...
by Griffin Ellis | Oct 21, 2025 | Behind the Build
BEHIND THE BUILD: SAVANNAH BANANAS Two Games. Two Control Rooms.One Massive Project. I’m beyond grateful that my team was entrusted by the Bananas to design and integrate the Savannah Bananas’ new control rooms, This is a project that pushed us, challenged us, and...